Download Print this page
YASKAWA SI-B3 Quick Start Manual
YASKAWA SI-B3 Quick Start Manual

YASKAWA SI-B3 Quick Start Manual

Bacnet option cheat sheet
Hide thumbs Also See for SI-B3:

Advertisement

Quick Links

The following
Step
1
Option Card Information
procedure is a
supplement to
other
Applicable Models
documentation
The option can be used with the following drive models:
supplied with the
Drive Series
Drive Model
SI-B3 option card.
This document
CIMR-A*2A****
will cover option
CIMR-A*4A0002* to 4A0675*
A1000
card information,
CIMR-A*5A****
installation,
CIMR-P*2A****
diagnostics,
P1000
CIMR-P*4A0002* to 4A0675*
addressing,
CIMR-P*5A****
related drive
CIMR-PW2A****
parameters,
iQpump1000
CIMR-PW4A0002* to 4A0675* 8550 or later
accessing drive
CIMR-PW5A***
parameters and
error codes.
Receiving
Please perform the following tasks upon receipt of the
option:
Drives can be
monitored and
·
Inspect the option for damage. Contact the shipper
immediately if the option appears damaged upon
controlled by a
receipt.
controller on a
·
Verify receipt of the correct model by checking the
Building
model number printed on the name plate of the
Automation and
option package.
Control network
·
Contact your supplier if you have received the
(BACnet) using RS-
wrong model or the option does not function
properly.
485 technology
and MS/TP
Option Package Contents
(Master-Slave/
Token-Passing)
protocol. The
drives conform to
the BACnet
application
specific controller
(B-ASC) device
profile. Up to 127
drives can
communicate on a
single BACnet MS/
TP network.
Tools required for installation
·
A Phillips screwdriver (M3 metric/#1, #2 U.S. standard
Please read this
size) is required to install the option and remove drive
front covers. Screw sizes vary by drive capacity.
cheat sheet and
Select a screwdriver appropriate for the drive
other
capacity.
documentation
·
Diagonal cutting pliers. (required for some drive
provided with
models)
the SI-B3 option
·
A small file or medium grit sandpaper. (required for
card thoroughly
some drive models)
before
·
A straight-edge screwdriver (blade depth: 0.4 mm,
attempting any
width: 2.5 mm) is required to wire the option terminal
installation.
block.
SI-B3 BACnet Option Cheat Sheet
Step
2
In this step the SI-B3 option card is installed. WITH POWER OFF install the SI-B3 card as shown below. Make sure to follow good
wiring practices and all applicable codes. Ensure that the option card is grounded properly as shown in item
This option card can be inserted into the CN5-A connector located on the drive's control board.
Software
Version
1017 or later
1017 or later
1017 or later
5045 or later
8500 or later
8500 or later
8500 or later
8550 or later
8550 or later
Terminal Block TB1
1
IG5
Isolated supply ground reference
2
+
RX/TX (+) signal
3
-
RX/TX (-) signal
4
SHLD
Shield Ground
Option Card Installation
Prior to installing the option, wire the drive, make necessary connections to the drive terminals, and verify that the drive functions normally without the option
installed. Refer to the Quick Start Guide packaged with the drive for information on wiring and connecting the drive. Shut off power to the drive, wait the
appropriate amount of time for voltage to dissipate, then remove the digital operator (G) and front covers (F, I). Front cover removal varies by model.
DANGER! Electrical Shock Hazard. Do not connect or disconnect wiring while the power is on. Failure to comply will result in death or serious injury. Before
installing the option, disconnect all power to the drive. The internal capacitor remains charged even after the power supply is turned off. The charge indicator
LED will extinguish when the DC bus voltage is below 50 Vdc. To prevent electric shock, wait at least five minutes after all indicators are off and measure the
DC bus voltage level to confirm safe level.
NOTICE: Damage to Equipment. Observe proper electrostatic discharge procedures (ESD) when handling the option, drive, and circuit boards. Failure to
comply may result in ESD damage to circuitry.
1
Option PCB – 1x
PN: UTC00043o
Ground Wire – 1x
Screws (M3) – 3x
Remove the Front Covers and Digital Operator
3
LED Label – 1x
Insert the Option
Wiring the Option
Depending on the drive model, some drives may require routing the wiring through the side of the front cover to the outside to provide adequate space for the
wiring. In these cases, using diagonal cutting pliers, cut out the perforated openings on the left side of the drive front cover. Sharp edges along the cut out
should be smoothed down with a file or sand paper to prevent any damage to the wires. Route the communication wiring inside the enclosure for drives that do
not require routing through the front cover.
Yaskawa America, Inc., 2121 Norman Drive South, Waukegan, IL 60085, (800) YASKAWA (927-5292)
Installing the SI-B3 Option Card
SI-B3 Option Card
A
- Ground terminal and installation hole <1>
- Terminal block TB1
B
- Terminating resistor switch S1
C
- Connector (CN5)
D
E
- Installation hole
<1> Connect the ground wire provided in the
F
- LED (NS)<2>
option shipping package during installation.
- LED (MS)<2>
G
- LED (RX)<2>
<2> Refer to Option LED section Step 3 for
H
details on the LEDs.
I
- LED (TX)<2>
A
Connector CN5-C
2
Connector CN5-B
B
C
Connector CN5-A
D
Insertion point for CN5 Connector
E
SI-B3 option
F
Drive front cover
Digital operator
G
H
LED label
Drive terminal cover
I
J
Removable tabs for wire routing
K
Included screws
L
Ground wire
M
Terminal block TB1
Drive grounding terminal (FE)
N
Apply the LED Label
4
Note: 'A' indicates wire routing.
Connect the Ground Wire
Fax (847) 887-7310, DrivesHelpDesk@yaskawa.com, www.yaskawa.com, Document Number: TM.BACnet.01 11/28/2012 © Yaskawa America,
Step
Option LED Display and
3
Power-Up Diagnostics
Option LED Display
below.
4
The BACnet option has four LEDs.
Two bi-color Status LEDs:
Module status (MS) and Network status (NS) (red/green)
Two BACnet LEDs:
Transmit (TX) and Receive (RX) (green)
The operational states of the option LEDs after completion of
the BACnet power-up diagnostic LED sequence are
described in the table below. Wait at least 2 seconds for the
power-up diagnostic process to complete before verifying
LED states.
Display
Name
Color
Status
OFF
Green
ON
Green
Flashing
MS
Red
Flashing
Red
ON
Green/
Flashing
Red
OFF
Green
ON
Green
Flashing
NS
Red
Flashing
Red
ON
Green/
Flashing
Red
OFF
TX
Green
Flashing
5
OFF
RX
Green
Flashing
Power-Up Diagnostics
An LED test is performed each time the drive is powered
up. The initial boot sequence may take several seconds.
After the LEDs have completed the diagnostic LED
sequence, the option is successfully initialized. The LEDs
then assume operational conditions as shown in the table
below.
Sequence
Module Status (MS)
1
Green
Wire routing
2
Red
3
Green
4
Green
5
Green
6
Green
Page 1 of 2
Operating
Remarks
Status
Power supply
Power is not being sup-
OFF
plied to the drive.
The option is operating
Normal operation
normally and initializa-
tion is complete.
The option is in process
Standby/
of configuring or waiting
Initializing
for configuration infor-
mation.
The option has detected
a recoverable minor
Minor fault
fault such as incomplete
configuration.
The option has detected
Major fault
an unrecoverable major
fault.
The option is in self-test
Option self-test
mode.
Power supply
OFF
The device is currently
Connected
communicating on the
network.
The device currently is
not communicating, but
is correctly configured.
Not connected
The state is "waiting" for
communication to re-
sume.
A minor recoverable
Minor fault
fault has occurred.
A non-recoverable ma-
Major fault
jor network fault has
occurred.
Power-up sequence and
Network test
testing.
No data being
This node is not sending
sent to the net-
any data.
work
Data being sent
This node is sending
to the network
network data.
The option is not physi-
No data seen on
cally connected to the
the network
network or there is no
network activity.
Data is seen on
The option is connected
the network
to a network.
Network Status (NS)
Time (ms)
OFF
250
OFF
250
OFF
Green
250
Red
250
OFF

Advertisement

loading

Summary of Contents for YASKAWA SI-B3

  • Page 1 Option LED Display In this step the SI-B3 option card is installed. WITH POWER OFF install the SI-B3 card as shown below. Make sure to follow good Applicable Models wiring practices and all applicable codes. Ensure that the option card is grounded properly as shown in item below.
  • Page 2 F6-48 to D687H and set F6-49 to 12H. bles the data in active RAM. Parameter changes remain after cycling power. Yaskawa America, Inc., 2121 Norman Drive South, Waukegan, IL 60085, (800) YASKAWA (927-5292) Fax (847) 887-7310, DrivesHelpDesk@yaskawa.com, www.yaskawa.com, Document Number: TM.BACnet.01 11/28/2012 © Yaskawa America,...