FADAL MACHINING CENTERS
3.1 MACHINE
INSTALLATION &
HOOK-UP

3.1.1 UNPACKING

3.1.2 PLACING THE
VMC
42
Tools Required
Hammer, 15/16" socket or wrench and knife
1. Remove the crate and/or protective material from around the VMC.
2. Remove the strapping material from the front doors.
3. Unload the boxes from the inside and/or around the VMC.
4. Remove each of the four 5/8" bolts and nuts between the base of the VMC and the
pallet.
1. Place the leveling pads (countersink side up) under the leveling bolts. Be sure
leveling bolts go into countersink on leveling pads.
NOTE
Use leveling pad SHp-0002 (PLC-0063 for slant sheet metal machines, or machines equipped with
the HydroSweep option) for placing the machine. Any other pad may cause damage to the machine.
2. Remove the fork lift bars or the eye bolts and the steel bar from the column.
INSTALLATION PROCEDURE
MAN-0126_R1