Concluding Steps - Fujitsu PRIMERGY CX2560 M4 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX2560 M4:
Table of Contents

Advertisement

6.4.3.3

Concluding steps

Perform the following procedures:
"Installing the riser module" on page 55
Ê
"Installing the memory slot air duct (Air cooling only)" on page 64
Ê
"Installing the server node in the server enclosure" on page 67
Ê
Ê Reconnect all external cables.
"Controls and indicators on the server node" on page 448
Ê
"Updating expansion card firmware" on page 83
Ê
CX2550/60/70 M4
Expansion cards and OCP mezzanine cards
Upgrade and Maintenance Manual
(if applicable)
151

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2550 m4Primergy cx2570 m4

Table of Contents