Completing The Installation - D-Link DUB-E130 User Manual

Usb type-c to gigabit ethernet adapter
Hide thumbs Also See for DUB-E130:
Table of Contents

Advertisement

Section 2 - Installation
When the installation of the DUB-E130 is complete, the Connection Speed LED will illuminate solid orange when the DUB-E130
is connected to a 1 Gbps network and remains off when connected to a 10/100 Mbps network. The Link/ACT LED will be solid
green when a connection is present, and flash green when data is being transmitted or received. If both LEDs are unlit, there
may be a problem with the physical connection. Check the connection and cables between the DUB-E130 and your hub,
switch, or router. Also verify that your network switch or router is powered on.
1
ID
Indication
1
Connection Speed
2
D-Link DUB-E130 User Manual

Completing the Installation

Status
Solid
Off
Solid
Link/ACT
Flashing
2
Description
1 Gbps connection present
10/100 Mbps connection present
An active connection is present
Data is being transmitted/received
12

Advertisement

Table of Contents
loading

Table of Contents