Download Print this page

Eaton 9395 Installation Instructions And Operators Manual page 3

1000–1200 kva

Advertisement

1 M12
50mm Bolt, 2 Flat
Washers, 1 Conical Washer,
and 1 Nut from UPS
Hardware Kit (6 places)
Bypass Input Terminal (Phase C)
Bypass Input Terminal (Phase A)
Bypass Input Terminal (Phase B)
Rectifier Input Terminal (Phase C; Phase A on 600V)
Bus Bar Extension
Single Feed Jumpers from Kit (4 per phase)
Rectifier Input Terminal (Phase B)
Bus Bar Extension (Not required on 600V)
Single Feed Jumpers from Kit (4 per phase)
Rectifier Input Terminal (Phase A; Phase C on 600V)
Bus Bar Extension
Single Feed Jumpers from Kit (4 per phase)
Tie Wraps (6 places)
NOTE Install bus bar extensions to back side of rectifier input bus bars to provide clearance for bolts and wires.
NOTE Verify each rectifier phase terminal is jumpered to the same phase on the bypass terminal.
NOTE Install rectifier input lugs using M12
Eaton 9395/9395P UPS (1000–1200 kVA) Single Feed Kit Installation Instructions
EATON 9395/9395P UPS (1000–1200 KVA) SINGLE-FEED KIT INSTALLATION
5.
Using tie wraps from the single-feed kit (see Table 1), secure cables to the
internal cabinet divider (see Figure 1).
6.
Return to the applicable Eaton 9395/9395P UPS manual to complete the wiring.
Use M12 60mm bolts from the single-feed kit (see Table 1) to install rectifier
input lugs.
60mm bolts from the single-feed kit.
Figure 1. 9395/9395P 1000–1200 kVA UPS Single-Feed Kit
Front
S
P-1640000610 Rev 1 www.eaton.com/powerquality
1 M12
50mm Bolt, 2 Flat
Washers, 1 Conical Washer,
and 1 Nut from UPS
Hardware Kit (6 places)
1 M12
60mm Bolt from
Single-Feed Hardware Kit
(18 places)
2 Flat Washers, 1 Conical
Washer, and 1 Nut from
UPS Hardware Kit (18 places)
1 M12
50mm Bolt, 2 Flat
Washers, 1 Conical Washer,
and 1 Nut from UPS
Hardware Kit (6 places)
2

Advertisement

loading

This manual is also suitable for:

9395p