Startup Sequence - Cisco 7935 Quick Start Manual

Ip conference station
Hide thumbs Also See for 7935:
Table of Contents

Advertisement

Follow these steps to install and connect the IP Conference Station to the network.
Place the IP Conference Station on a flat surface, for example, a conference room table or
Step 1
desktop.
Connect one end of the 6 ft. CAT 5 cable to your data network port and connect the other
Step 2
end to the network (LAN) port on the PIM.
Connect the free end of the 25 ft. CAT 5 cable to the RJ-45 port on the bottom of the
Step 3
IP Conference Station. (The cable is pre-plugged into the PIM.)
Connect the Power Supply unit to the AC adapter port on the PIM, and plug the other end
Step 4
into a standard electrical power outlet in the wall.
If you do not correctly connect the cables, PIM, power supply, and the
Note
IP Conference Station unit, the IP Conference Station will not work.
Use of non-Cisco certified components may not work and may void the
IP Conference Station product warranty.

Startup Sequence

During the startup sequence, the LCD screen display shows the following messages.
Sequence Step
Startup
IP Address configuration
Cisco CallManager configuration
10
LCD Screen Message Display
Cisco Systems, Inc.
Polycom Technology
Copyright 2001
Renewing/Obtaining IP Address
Loading Application
Configuring IP
Press Menu to Reconfigure
Station IP (IP address)
Contacting (IP address)

Advertisement

Table of Contents
loading

Table of Contents