Travis Industries ProBuilder 42 Installation Manual page 19

42 & 54 linear gsb2
Hide thumbs Also See for ProBuilder 42:
Table of Contents

Advertisement

5
On the header shield, bend the two tabs downward approximately 90 degrees. Set the header shield
onto the standoffs with the 90° bend facing the pipe shield. The tips of the standoffs will protrude through
the heat shield. Attach the heat shield to the standoffs by aligning the holes on the heat shield tabs with
the holes in the header standoffs and secure using the included screws
Align holes
6
When finished the fireplace should be configured like the picture below.
© Travis Industries
Installation
(for qualified installers only)
Bend tabs
down 90°
3/13/18 - 1474
19
42 & 54PB GSB2 Aust.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Probuilder 54

Table of Contents