1
Screw locking adhesive location(1401M : produced by THREE BOND)
A
B
Precautions in handling the PU.
* Caution: Do not touch the shaded section in the drawing below.
C
Do not touch the optical parts.
D
Hologram (be careful for the static electricity)
GRT adjustment section
E
F
72
1
2
RF level adjustment section
AVH-P5900DVD/XN/UC
2
3
Screw locking adhesive location
Apply the locking agent for more than half of the screw head
circumference.
* Caution: The locking agent shall not overflow to outside of
the PU case.
Do not touch the springs.
3
4
4