Installing The Front Bezel - Dell SCv2000 Getting Started Manual

Storage center
Hide thumbs Also See for SCv2000:
Table of Contents

Advertisement

Figure 4. Mount the SCv2000/SCv2020 Storage System Chassis
7.
Secure the storage system chassis to the rack using the mounting screws within
each chassis ear.
a. Lift the latch on each chassis ear to access the screws.
b. Tighten the screws to secure the chassis into the rack.
c. Close the latch on each chassis ear.
For more information about installing the storage system, see the Dell Storage
Center SCv2000/SCv2020 Storage System Deployment Guide
8.
If the Storage Center system includes expansion enclosures, mount the
expansion enclosures in the rack. For more information about installing an
expansion enclosure, see the Getting Started Guide included with the expansion
enclosure.

Installing the Front Bezel

Install the bezel on the front of the storage system.
1.
Hook the right end of the bezel onto the storage system.
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scv2020

Table of Contents