Download Print this page

Arrow Storage Products LM101267S Owner's Manual & Assembly Instructions

10’ x 12’

Advertisement

Quick Links

721090615
Owner's Manual
& Assembly Guide
Gloves must be worn
at all times to reduce
risk of injury!
Customer Service:
1-800-851-1085
assist@arrowsheds.com
BUILDING DIMENSIONS
Approx.
Size
10' x 12'
115 Sq. Ft. 693 Cu. Ft.
3,0 m x 3,6 m
10,7 m
* See Inside for Detailed Safety Information.
or
Size rounded off to the nearest foot
Exterior Dimensions
Storage
(Roof Edge to Roof Edge)
Area
Width
123 1/4"
2
19,6 m 3
313,1 cm
Depth
Height
Width
145 3/4"
77 7/8"
118 1/4"
370,2 cm
197,8 cm
300,4 cm
www.arrowsheds.com
Model No.
10' x 12'
Base
121" x 143 1/4"
Size
307,3 cm x 363,9 cm
For proper base construction see page 12
Interior Dimensions
(Wall to Wall)
Depth
Height
140 1/2"
76 5/8"
356,9 cm
194,6 cm
01AW
LM101267S
Nominal Size
Door
Opening
Width
Height
55 1/2"
65"
141,0 cm
165,1 cm

Advertisement

loading

Summary of Contents for Arrow Storage Products LM101267S

  • Page 1 01AW 721090615 Owner’s Manual & Assembly Guide Gloves must be worn www.arrowsheds.com at all times to reduce risk of injury! Model No. LM101267S 10’ x 12’ Nominal Size Customer Service: 1-800-851-1085 Base 121” x 143 1/4” assist@arrowsheds.com Size 307,3 cm x 363,9 cm...
  • Page 2 SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
  • Page 3 ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
  • Page 4 FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
  • Page 5 What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
  • Page 6 What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
  • Page 7 HARDWARE LIST... 07AW Hardware Views by Key No. Part Part Qty. Description #2 Phillips #2 Phillips List 11/32 Hex. 65103 Hex Nut (#8-32) 65923 Small Bolt (#8-32 x 3/8) (10 mm) 65004 Small Screw (#8AB x 5/16) (8 mm) 65900A Black Tapping Screw (#10B x 1/2) (13 mm) #2 Phillips 66045...
  • Page 8 PARTS LIST... 08AW Selected End Views by Key No. Part No. Part Description Qty. List 3719 Door Handle Brace 6635 Gable Brace 9365 Front Wall Channel 10497 Horizontal Door Brace 5986 Rear Wall Angle 8&9 6000 Right Gable 6001 Left Gable 6014 Side Roof Trim 6015...
  • Page 9 ASSEMBLY BY KEY NO. 09AW Walls Floor...
  • Page 10 ASSEMBLY BY KEY NO. 10AW Roof Doors...
  • Page 11 ASSEMBLY OVERVIEW 11AW Install Corners, Wall Angles, and Door Build the Floor Frame Track Install Wall Panels, Wall Channels, and Attach Gables and Roof Beams Door Jambs Install Roof Panels, Ridge Cap, Side Install Doors Trim, and Corner Cap Shed is now complete.
  • Page 12 CONSTRUCTING A BASE... 12AW No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 13 Step 1: Floor Frames 13AW Washers are to be used on painted parts only. You will need for this page: Washers are not necessary on unpainted parts 10392 and there are not enough to use on every screw and bolt. Side Floor (QTY: 8) Frame...
  • Page 14 Step 1: Continued You will need for this page: 8936 Rear Floor (QTY: 5) Frame Assemble the Rear Floor Frames. Bolts thru Top. Bolts thru Bottom. 8936 Overlap two (2) Rear Floor Frames as shown and secure with fi ve (5) bolts. Two (2) bolts must enter from bottom.
  • Page 15 Step 1: Continued You will need for this page: 119 3/8” 303,2 cm 9367 8934 Finished Length Front Floor Ramp (QTY: 8) Frame Overlap Length 7 3/8” 18,7 cm 9367 Overlap the Ramp and two (2) Front Floor 8934 Frames so that four (4) holes align at each end as shown.
  • Page 16 Step 2: Wall Frames 16AW You will need for this page: 5986 10389 Rear Channel Rear Angle (QTY: 9) 5986 5986 10389 Overlap two (2) Rear Wall Channels so that eight (8) holes align as shown. Insert a bolt and nut through each hole.
  • Page 17 Step 2: Continued 17AW You will need for this page: 10390 10393 140 3/8” 356,6 cm Finished Length Side Channel Side Angle (QTY: 18) 10393 10390 10393 Overlap two (2) Side Wall Channels so that eight (8) holes align as shown. Insert a bolt and nut through each hole.
  • Page 18 Step 3: Roof Beams 18AW You will need for this page: 10568 10568 BUILD TWO (2) BEAMS Roof Beam (QTY: 16) Overlap two (2) Roof Beams so that the bottom slots align as shown. Insert six (6) bolts and nuts as shown below. Insert two (2) bolts and nuts into slots on bottom of the Beam as shown.
  • Page 19 Step 3: Continued 19AW You will need for this page: 10568 142 3/8” 361,6 cm Finished Length Roof Beam (QTY: 14) Overlap two (2) Roof Beams so that bottom slots align but DO NOT INSERT BOLTS. Next, overlap two (2) more Roof Beams to form a second Roof Beam Assembly.
  • Page 20 Step 4: Door Track You will need for this page: 6403 9366 Long Leg on top. (QTY: 4) Track Splice Door Track Door Slide Insert screws into bottom side only. The Gables will fasten to the Door Track using the holes on the top side. Position Slides as shown.
  • Page 21 Step 5: Frame Assembly You will need for this page: Assemblies from Step 1: • Front Floor Assembly (1) • Side Floor Assembly (2) • Rear Floor Assembly (1) (QTY: 8) (QTY: 2) Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected.
  • Page 22 Step 6: Corners 22AW You will need for this page: 6627 9374 6633 (QTY: 38) (QTY: 4) Corner Panel Wall Panel Front Panel Place washers on all bolts and screws used 6627 6627 on painted parts. 6633 6633 Use one person to support the Corner while another secures the Panels.
  • Page 23 Step 7: Wall Framing 23AW You will need for this page: Assemblies from Step 2 and Step 4: • Rear Wall Angle Assembly (1) • Side Wall Angle Assemblies (2) • Door Track Assembly (1) (QTY: 30) Wall Angles must face inside the building. Door Slides should be in Door Track at this time.
  • Page 24 Step 8: Wall Panels 24AW FASTEN TO WALL ANGLES You will need for this page: 6627 [ NO HARDWARE NEEDED FOR THIS STEP ] Wall Panel Lay out all Panels in the positions shown below. FASTEN TO WALL CHANNELS (STEP 10) Use the diagram to the right when attaching Wall Panels.
  • Page 25 Step 8: Continued 25AW You will need for this page: Working one side at a time, lift the Panels into (QTY: 84) (QTY: 13) place and secure top and bottom of Panels with screws. Be sure to overlap ribs as shown on the previous page.
  • Page 26 Step 9: Door Jambs 26AW You will need for this page: 9370 Door Jamb (QTY: 8) (QTY: 4) Secure Door Jambs with two (2) screws in the top and bottom of each Panel as shown. Insert two (2) bolts and nuts into the back side of each Panel as shown below.
  • Page 27 Step 10: Wall Channels 27AW You will need for this page: Assemblies from Step 2: 9365 • Rear Wall Channel Assembly (1) • Side Wall Channel Assemblies (2) Front Channel (QTY: 64) (QTY: 4) Install Rear Wall Channel by placing screws through all remaining holes in Wall Panels.
  • Page 28 Step 11: Gables 28AW You will need for this page: 6001 6000 5971 (QTY: 8) Left Gable Right Gable Bracket GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MIS- TAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Edge Trim (Plastic) Edge Trim MUST cover Gable edge.
  • Page 29 Step 11: Continued 29AW You will need for this page: 6635 (QTY: 8) (QTY: 3) Gable Brace Gable must fi t UNDER Side Wall Angle at corner. Working with one Gable at a time, attach the Rear Gables to the Rear Use bolts where Angles overlap.
  • Page 30 Step 11: Continued 30AW You will need for this page: 6635 (QTY: 12) (QTY: 4) Gable Brace Track Sup. Leave two (2) holes open on each side of the Gable peak to attach Track Support. Working with one Gable at a time, attach the front Gables to the Door Track with screws.
  • Page 31 Step 12: Roof Framing 31AW You will need for this page: Assemblies from Step 3: • Main Roof Beam Assembly (1) • Single Roof Beam Assemblies (2) (QTY: 12) Tape should wrap around gap between Gables. Top View of Gables Seal the gap between the Gables using the weather stripping tape as shown.
  • Page 32 Roof Install Prep Page 32AW Use the information on this page to complete steps 13 thru 14. If Roof Beam holes do not line up with Roof Panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up.
  • Page 33 Step 13: Roof Assembly 33AW You will need for this page: 10408 10409 Roof Skylight (QTY: 6) Panel Panel Place Skylight Panel and Roof Panel according to the diagram below. Ensure that the ends of the Panels with the slotted holes are at the same end with the slot to the outside of the fi...
  • Page 34 Step 13: Continued 34AW You will need for this page: 6641 6640 67545 Right Roof Weather Left Roof (QTY: 10) (QTY: 16) Stripping Panel Panel Attach Back Right Roof Panel to Top Roof Beam only using four (4) screws. Remove Edge Trim from the Left Gable under the Roof Panel.
  • Page 35: Peak Cap

    Step 13: Continued 35AW You will need for this page: 6529 6869 Roof Panel Ridge Cap (QTY: 16) (QTY: 4) FASTEN TO RIDGE CAP (NEXT TWO PAGES) Continue to apply weather stripping. Attach two (2) Roof Panels using the diagram to the left while assembling the roof.
  • Page 36 Step 13: Continued 36AW You will need for this page: 6868 • Skylight Assemblies (2) Ridge Cap (QTY: 16) (QTY: 4) Don’t focus weight Continue to apply weather stripping. on roof! Attach two (2) Skylight Assemblies, one at a time, to Roof Beams using eight (8) screws.
  • Page 37 Step 13: Continued 37AW You will need for this page: 6869 6529 6641 6640 Left Roof Right Roof (QTY: 72) (QTY: 18) Roof Panel Ridge Cap Panel Panel Continue to apply weather stripping. Attach Roof Panels, one at a time, to Roof Beams using eight (8) screws per Panel.
  • Page 38 Step 14: Roof Trim 38AW You will need for this page: 6015 6014 (QTY: 4) (QTY: 8) (QTY: 4) Roof Trim Roof Trim Trim Cap (L) Trim Cap (R) Slide Peak Cap legs under Ridge Cap and Peak Cap secure with two (2) bolts and nuts on each end.
  • Page 39: Door Handle Brace

    Step 15: Door Assembly 39AW You will need for this page: 10477 3719 6300 Door Handle Brace Vert. Brace (QTY: 3) (QTY: 2) Handle Do not fully tighten the bolts that hold on the Door Handle until the Vertical Door Brace is in place. Attach the Door Handle and Door Handle Brace to the Door with two (2) bolts and nuts as shown.
  • Page 40: Horizontal Door Brace

    Step 15: Continued 40AW You will need for this page: 10497 Horiz. Brace (QTY: 6) Door Guide Slide Horizontal Brace over Door edge and secure with one (1) bolt and nut in top and bottom. Secure the Door Guides and Lower Horizontal Door Brace as shown below.
  • Page 41: Door Track

    Step 16: Door Install 41AW You will need for this page: Assemblies from Step 16: • Right Door Assembly (1) • Left Door Assembly (1) (QTY: 8) Gable From inside the building, place the bottom Door Slide of the Door into the Front Floor Frame track at about the half-open position.
  • Page 42 ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
  • Page 43 CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.
  • Page 44: Roof Beam

    ARROW ACCESSORIES... ROOF STRENGTHENING FLOOR FRAME KITS (heavy snow load) KITS Extra roof beams and gable braces MODELS FB47410, FB5465, designed for added protection against FB106-A, FB109-A and FB1014-A heavy snow accumulation. Increases the strength of your roof. A simple fl oor frame system made of heavy-duty, hot-dipped BEFORE AFTER galvanized steel.