Zenith XBV243 series Service Manual page 46

Hide thumbs Also See for XBV243 series:
Table of Contents

Advertisement

GEAR ASSEMBLY P2/P3 (FIG. A-8-1/2)
1) Lift the Gear assembly P2.
2) Lift the Gear assembly P3.
NOTE: When reassembling, align the two Holes of the
Gear assembly P2 and P3 after aligning the Gear
Sector Hole(A) with the Plate Slider Hole(B) (see
the inset below).
BASE ASSEMBLY P2/P3 (FIG. A-8-3/4)
1) Move Base assembly P2 in the direction of the arrow
(A) along the slot in the Chassis and disassemble it
from the bottom side.
Gear assembly P2 Hole
Gear assembly P3 Hole
Lever spring Boss
VR168 - 923-03485
MECHANISM - VCR
2) Move Base assembly P3 in the direction of the arrow
Gear sector Hole(A)
Plate slider Hole(B)
(B)
Chassis
Base Assembly P3
(Fig. A-8-4)
Base Assembly P2
(Fig. A-8-3)
Fig. A-8
4-10
(B) along the slot in the Chassis and disassemble it
from the bottom side. Place the Mechanism face
down, or return to original position.
Gear Assembly P3
(Fig. A-8-2)
Gear Assembly P2
(Fig. A-8-1)
(A)
D35E COMBO - SERVICING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents