Complete The Step 7 Basic Program And Verify The Run-Time Operation - Siemens SIMATIC S7-200 Manual

Software conversion tool
Hide thumbs Also See for SIMATIC S7-200:
Table of Contents

Advertisement

2.5

Complete the STEP 7 Basic program and verify the run-time operation

1. Complete all program parameters and program logic.
2. Some S7-1200 CPU I/O channel assignments may use a different I/O channel number
3. Compile and download the user program to the S7-1200 CPU
4. Debug and verify the run-time operation the S7-1200 program.
Note
Monitoring program variables with STEP 7 Basic
STEP-7 Micro/WIN status charts are not converted. You must create the corresponding
STEP 7 Basic watch tables to monitor run-time data values.
Due to functional differences between the S7-200 and S7-1200, your user program may not
have been completely converted
An incomplete or improper conversion of your user program may cause unexpected
machine or process operation which could cause death, serious injury, or property damage.
You must review and check the converted program to ensure proper and safe operation in
your application.
SIMATIC S7-200 to SIMATIC S7-1200 software conversion tool
Manual, 1/2010
2.5 Complete the STEP 7 Basic program and verify the run-time operation
compared to the I/O channel numbers used in the S7-200 program. Reassign and rewire
the terminal block connections as needed.
WARNING
Program conversion process
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-1200

Table of Contents