Start−Up & Performance Checklist - Lennox OHR23-105 Installation Instructions Manual

Ohr23 series units. oil units
Table of Contents

Advertisement

OHR23 Start−Up & Performance Check List
Job Name
Job Location
Installer
Unit Model No.
HEATING SECTION
Electrical Connections Tight? -
Blower Motor
Piping Connections Tight? -
Oil Pump Pressure (recommended minimum 140 psi)
PROPER DRAFT
Draft Reading (recommended .03 to .04 inches w.c.)
Percent CO
(recommended 12%)
2
Flue Connections Tight? -
Percent CO
(recommended 12%)
2
Fan Control Cutout
Filter Clean & Secure? -
Serial No.
Supply Voltage
Burner Model No.
All Valves Open? -
Fan Control Setting (maximum 130_F 55_C)
Vent Clear? -
Job no.
City
City
Service Technician
Blower Motor Amps
Serial Number
Blower Motor Lubrication OK? -
Temperature Rise
Calibrated? -
Page 17
Date
State
State
THERMOSTAT
Heat Anticipator
Properly Set? - Level? -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ohr23-120Ohr23-140Ohr23-154

Table of Contents