▀ Site Prerequisites

Site Prerequisites
This section summarizes power, grounding, environment, and clearance requirements that must be met prior to
installing and operating the ASR 5500. For detailed information, refer to the Technical Specifications chapter.
Power and Grounding
Each PFU requires eight power feeds of 80A @ -48VDC (nominal). The feeds should be routed to the installation rack
from the site power supply using adequately sized conductors and circuit breakers in accordance with local electrical
codes.
The chassis must be grounded to a site ground point using the recommended conductors and lugs. The ground point
should be in close proximity to the ASR 5500 chassis to assure adequate conductivity.
Environment
The site's heating ventilation and air conditioning (HVAC) systems must be sized to maintain the operating
temperatures and relative humidity specified in the Technical Specifications chapter. HVAC capacity requirements will
vary based on the system configuration and associated power draw, as well as the operational characteristics of other
equipment installed at the site.
Clearance
Adequate clearance must be maintained at the front and rear of the ASR 5500 chassis to assure proper air flow and
allow maintenance access for the installation, removal and replacement of components. The recommended clearance is
36 inches (92 centimeters) at the front and rear of the chassis.