Method 02-0245
Figure 2 – PICOCELL 1900 front view
2.4 Customer Supplied Equipment
1.
Building wiring must be installed between each PICOCELL 1900
transceiver location and the equipment location where the CSI is
located. The mounting of each PICOCELL 1900 transceiver is
independent of CSI and MDF which may be installed later.
2.
Floor plans indicating PICOCELL 1900 mounting locations and
locations for CSI and MDF
3.
Cabling and pair assignment matching PICOCELL 1900 transceivers to
cable pair numbers.
4.
Building access authorization, security clearance if required and keys
for access to restricted CSI and PICOCELL 1900 equipment locations.
10 / Picocell 1900 Radio Unit Installation
September 3, 1998