Making Measurements; Connecting To The Circuit Under Test - Fluke 1550B User Manual

Megohmmeter
Hide thumbs Also See for 1550B:
Table of Contents

Advertisement

1550B
Users Manual

Making Measurements

Connecting to the Circuit Under Test

To avoid possible electric shock or personal injury:
• Remove all power from the circuit under test and discharge circuit
capacitance before testing a circuit with the Meter.
• Connect the test leads to the Meter inputs before connecting to the
circuit under test.
• Before and after testing, confirm that the Meter does not indicate the
presence of a hazardous voltage at the terminals. If the Meter beeps
continuously and a hazardous voltage is shown on the display,
disconnect test leads and remove power from the circuit under test.
To connect to the circuit under test:
1.
Rotate the safety shutter to expose the terminal connections.
2.
Insert the test leads in the terminals shown (Figure 8), and connect the test
leads to the circuit under test.
10
XW
Figure 8. Connecting to the Circuit Under Test
Warning
ASW09F.EPS

Advertisement

Table of Contents
loading

Table of Contents