Preparing for use
Good planning and preparation of machine applications are essential in terms of
keeping installation simple and avoiding errors, ensuring safe operation, and allowing
access to the machine for servicing and corrective maintenance.
This chapter outlines what you need to consider when configuring your plant in
relation to this machine and the preparations you need to make before the machine
is delivered.
4.1
Safety-related aspects to consider when
configuring the plant
A number of residual risks are associated with the machine. These are described in
the chapter titled "Safety information" (Page 77) and in related sections.
Take appropriate safety precautions (covers, barriers, markings, etc.) to ensure the
machine is operated safely within your plant.
4.2
Observing the operating mode
Observe the machine's operating mode. Use a suitable control system to prevent
overspeeds, thus protecting the machine from damage.
4.3
Delivery
Checking the delivery for completeness
The drive systems are put together on an individual basis. When you take receipt of
the delivery, please check immediately whether the items delivered are in
accordance with the accompanying documents. Siemens will not accept any claims
relating to items missing from the delivery and which are submitted at a later date.
● Report any apparent transport damage to the delivery agent immediately.
● Report any apparent defects/missing components to the appropriate SIEMENS
office immediately.
Archive the safety and commissioning notes provided in the scope of delivery as well
as the optionally available operating instructions so that these documents are always
easily accessible.
The rating plate optionally enclosed as a loose item with the delivery is provided to
enable the motor data to be attached on or near the machine or installation.