In case of alteration of the machine, not agreed upon by us, this declaration will lose its validity. Product description: WALK-BEHIND SPREADER Model: CT2204 Applicable EC Directives: EC Machinery Directive 2006/42/EC 20 Station Road, Rowley Regis, West Midlands, B65 0JU.U.K.
Page 3
1. HELPFUL HINTS: READ THE DIRECTIONS BEFORE ASSEMBLY WHEN ALL ELSE FAILS, READ THE DIRECTIONS AGAIN If your spreader does not spread evenly, be sure the FRONT on the gear box points to the front of the spreader. The impeller must turn clockwise. Reversing the gear box will cause the impeller to turn counter clockwise.
ASSEMBLY INSTRUCTION Turn Hopper (#16) upside down and attach Frame (#30) using four screws ST6.3 x 40 (#43). 2. a) Slide the Impeller (#42) onto the spindle of the Gear Box Assembly (#39). b) Insert Screw M4 x20 (#41) through the Impeller and the top of the gear box spindle. 3.
Page 5
5. Slip Inner Axle Bushing (#37) onto the right side of the axle, pushing the Inner Axle Bushing into the Outer Axle Bushing until tight. Attach Wheel (#36) to the right side of the axle by inserting a M5 x 45 bolt (#47) and fastening with Lock Nut M5 (#44). Attach Axle End Cap (#35) by tapping with a wooden or rubber mallet.
Page 6
Insert Handle Shaft (#26) between the top ends of the Wheel Assembly Frames (#20). Pass two Bolts M6 x 45 (#11) through Wheel Assembly Frames and Handle Shaft. Slip Pivot and Bracket Assembly (#19) onto protruding bolt ends. Fasten with Lock Nuts M6 (#24). Pivot and Bracket Assembly should be on the right side of the handle when standing behind the spreader.
Page 7
Push the Adjustable Handle (#6,#7) to the lowest position. 8. a) b) Insert the upper end of the Control Rod (#25) into the hole at the end of the Adjustable Handle (#6,#7). Take lower nut (#21) off the bottom end of the Control Rod (#25) and insert rod into the hole in the Pivot and Bracket Assembly (#19).
Page 8
a) The three large holes at the bottom of the hopper should match the three holes in the adjustable plate. If they match, do nothing. If they do not match, push the handle down to the lowest position and adjust the positions of the two nuts on the threaded control bar until the three holes match up.
Page 12
USING YOUR SPREADER 1. Determine approximate square footage of area to be covered and estimate amount of material required. 2. Before filling the hopper, make sure the flow control arm is in the off position and the closure plate is shut. 3.
Page 13
CANNON TOOLS LTD 20 Station road, Rowley Regis, West Midlands,B65 0JU.U.K. Made in China...