Lincoln Electric POWER WAVE STT Operator's Manual page 13

Hide thumbs Also See for POWER WAVE STT:
Table of Contents

Advertisement

POWER WAVE
®
STT
®
MODULE
INSTALLATION
• For circumferential applications, connect all work leads on one side of the weld joint, and all of the work voltage sense leads on
the opposite side, such that they are out of the current path.
A-6

Advertisement

Table of Contents
loading

Table of Contents