Connecting To Power Supply; Preparing The Connection - Siemens SITRANS LG250 Operating Instructions Manual

Guided wave radar, 4...20 ma/hart - two-wire coax probe with sil qualification
Table of Contents

Advertisement

Safety instructions
Voltage supply
Cable glands
PBD-51041387
5

Connecting to power supply

5.1

Preparing the connection

Always keep in mind the following safety instructions:
Warning:
Connect only in the complete absence of line voltage.
The electrical connection must only be carried out by trained
personnel authorised by the plant operator.
If overvoltage surges are expected, overvoltage arresters should
be installed.
Power supply and current signal are carried on the same two-wire
cable. The operating voltage can differ depending on the instrument
version.
The data for power supply are specified in chapter "Technical data".
Provide a reliable separation between the supply circuit and the
mains circuits according to DIN EN 61140 VDE 0140-1.
Keep in mind the following additional factors that influence the operat-
ing voltage:
Lower output voltage of the power supply unit under nominal load
(e.g. with a sensor current of 20.5 mA or 22 mA in case of fault)
Influence of additional instruments in the circuit (see load values in
chapter "Technical data")
The instrument is connected with standard two-wire cable without
screen. If electromagnetic interference is expected which is above the
test values of EN 61326-1 for industrial areas, screened cable should
be used.
Use cable with round cross section for instruments with housing and
cable gland. To ensure the seal effect of the cable gland (IP protection
rating), find out which cable outer diameter the cable gland is suitable
for.
Use a cable gland fitting the cable diameter.
Metric threads
In the case of instrument housings with metric thread, the cable
glands are screwed in at the factory. They are sealed with plastic
plugs as transport protection.
You have to remove these plugs before electrical connection.
NPT thread
In the case of instrument housings with self-sealing NPT threads, it is
not possible to have the cable entries screwed in at the factory. The
free openings for the cable glands are therefore covered with red dust
protection caps as transport protection.
Prior to setup you have to replace these protective caps with ap-
proved cable glands or close the openings with suitable blind plugs.
With plastic housing, the NPT cable gland or the Conduit steel tube
must be screwed without grease into the threaded insert.
SITRANS LG250 - Operating Instructions
17

Advertisement

Table of Contents
loading

Table of Contents