Configuring A Two-Post Flush-Mount - Dell Networking S3100 Series Getting Started Manual

Hide thumbs Also See for Networking S3100 Series:
Table of Contents

Advertisement

Figure 21. 1U Tool-Less Configuration

Configuring a Two-Post Flush-Mount

To install your switch using a two-post flush-mount configuration, follow these steps.
1.
For this configuration, remove the castings from the front side of each ReadyRails assembly. See item
1 in the following illustration. To remove the two screws from each front flange ear (on the switch
side of the rail) and remove each casting, use a Torx driver. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
2.
Attach one rail to the front post flange with two user-supplied screws. See item 2 in the following
illustration.
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange with two user-supplied screws. See item 3 in the following illustration.
4.
Repeat this procedure for the second rail.
30
Installation

Advertisement

Table of Contents
loading

Table of Contents