Installation - BW Technologies MicroDock Quick Reference Manual

Automatic test and calibration station
Table of Contents

Advertisement

Installation

Note: A demand flow regulator must be used with all gas bottle
connections.
Attach all gas connections. Inlet 1 is configured for ambient air
and inlet 2 is configured for the four-gas mixture. For additional
gas inlets, please contact the factory.
Note: If the atmosphere is not free of background gas, connect
a zero air bottle to inlet 1 on the Station.
Plug the Station into a VAC outlet or refer to the Battery
Installation section for battery installation instructions.
Refer to Appendix A in the MicroDock User Manual for PC
software installation and user instructions.
Item
Inlet filter assembly
A
B
Calibration gas hose
Demand flow regulator and gas cylinder
C
Power connection
D
USB connection
E
Gas outlet
F
Description
MicroDock
Installation
5

Advertisement

Table of Contents
loading

Table of Contents