Download Print this page

Shark 100T Quick Start Manual

Power and energy meter/transducer
Hide thumbs Also See for 100T:

Advertisement

Mechanical Installation

Release clip
DIN Installation
Installation Steps:
Slide top of groove of meter onto DIN Rail. Press gently until the meter clicks into place. If
mounting with DIN Rail provided, use Black Rubber Stoppers (also provided) shown above.
To remove meter, pull down on Release clip
LINE
N
A
B
C
CT
Shorting
Block
Earth Ground
HI
lc
LO
FUSES
3 x 0.1A
N
A
B
C
LOAD
LINE
A
B
C
CT
Shorting
Block
Earth Ground
HI
lc
LO
FUSES
3 x 0.1A
A
B
C
LOAD
NOTE: Other wiring configurations are available. See the full Manual on the enclosed CD.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
Shark® 100T Quickstart Guide
DIN Rail with black
rubber stoppers
. Electrical Installation:
Power
Supply
Connection
GND
FUSE
L(+)
HI
HI
L(+)
N(-)
3A
N(-)
lb
la
Vref
Va
LO
LO
Vb
Vc
WYE direct, 3
phase, 4 wire
Power
Supply
Connection
GND
FUSE
L(+)
HI
HI
L(+)
N(-)
3A
N(-)
lb
la
Vref
Va
LO
LO
Vb
Vc
Delta direct, 3
phase, 3 wire
4.78"
[12.10cm]
HI
Ic
LO
0.91"
3.25"
[2.31cm]
[8.26cm]
Select diagram for your application
LINE
N
A
B
C
CT
Shorting
Block
Earth Ground
Earth Ground
N
A
B
C
LOAD
LINE
A
B
C
CT
Shorting
Block
Earth Ground
Earth Ground
A
B
C
LOAD
#
Doc
E145704
V.1.10
Shark® 100T Quickstart
4.16"
0.62"
[10.60cm]
[1.61cm]
HI
HI
Ib
Ia
LO
LO
100T
Dimensions
.
Power
Supply
Connection
GND
FUSE
L(+)
L(+)
HI
HI
HI
N(-)
3A
N(-)
lc
lb
la
Vref
Va
LO
LO
LO
Vb
Vc
FUSES
3 x 0.1A
WYE with PTs,
3 phase, 4 wire
Power
Supply
Connection
GND
FUSE
L(+)
L(+)
HI
HI
HI
N(-)
3A
N(-)
lc
lb
la
Vref
Va
LO
LO
LO
Vb
Vc
FUSES
2 x 0.1A
Delta with PTs, 3
phase, 3 wire
QS - 1

Advertisement

loading

Summary of Contents for Shark 100T

  • Page 1: Mechanical Installation

    Shark® 100T Quickstart Shark® 100T Quickstart Guide Mechanical Installation 4.78" [12.10cm] 4.16” 0.62” [10.60cm] [1.61cm] DIN Rail with black rubber stoppers Release clip 0.91" 3.25” 100T [2.31cm] DIN Installation [8.26cm] Dimensions Installation Steps: Slide top of groove of meter onto DIN Rail. Press gently until the meter clicks into place. If mounting with DIN Rail provided, use Black Rubber Stoppers (also provided) shown above.
  • Page 2 100T meter’s RS485 port uses standard 2-wire, half duplex architecture. Factory Initial Default Settings: When the Shark 100T is powered up, for 10 seconds you can connect to the meter using the Factory Default Settings (even if the Device Profile has been changed). After 10 seconds the Device Profile reverts to the actual Device Profile in use.
  • Page 3 Set Pt-n value as 345, Pt-d value as 69, Pt-S value as 1000. Update Device: 8.When changes are complete, click the Update button to send a new profile to the Shark 100T meter. 9.Click Cancel to Exit the profile (or) click other tabs to update other screens.
  • Page 4 Shark® is a registered trademark of Electro Industries/GaugeTech. The distinctive shape, style, and overall appearance of the Shark® meter is a trademark of Electro Industries/GaugeTech. Windows® is a registered trademark of Microsoft Corporation in the United States and/or other countries.