Step 3--Provide
Clearances
The required
minimum
service clearances
are shown
in Fig. 5 and
6. Adequate
ventilation
and outdoor
air nmst be provided.
The
outdoor
fan draws air through
the outdoor
coil and discharges
it
through
the top fan grille. Be sure that the fan discharge
does not
recirculate
to the outdoor
coil. Do not locate the unit in either a
corner or under
an overhead
obstruction.
The minimum
clearance
under a partial overhang
(such as a normal house overhang)
is 48 in.
above the unit top. The maximum
horizontal
extension
of a partial
overhang
must not exceed
48 in.
IMPORTANT:
Do not restrict outdoor airflow. An air restriction
at
either the outdoor-air
inlet or the fan discharge
may be detrimental
to compressor
life.
Do not place the unit where water, ice, or snow from an overhang
or roof will damage
or flood the unit. Do not install the unit on
carpeting
or other
combustible
materials.
Slab-mounted
units
should be at least 4 in. above the highest expected
water and runoff
levels. Do not use unit if it has been under water.
Step 4--Rig
and Place Unit
Rigging
and handling
of this equipment
can be hazardous
for many
reasons
clue to the installation
location (roofs.
elevated
structures.
etc.).
Only trained,
qualified
crane operators
and ground
support
staff
should handle and install this equipment.
When
working
with
this equipment,
observe
precautions
in the
literature, on tags, stickers, and labels attached to the equipment,
and
any other safety precautions
that might apply.
Training
for operators
of the lifting equipment
should include,
but
not be limited to. the following:
1. Application
of the lifter to the load, and adjustment
of the
lifts to adapt to various
sizes or kinds of loads.
2. Instruction
in any special operation
or precaution.
3. Condition
of the load as it relates to operation
of the lifting
kit, such as balance,
temperature,
etc.
Follow
all applicable
safety codes.
Wear safety shoes
and work
gloves.
INSPECTION
Prior to initial use, and at monthly
intervals,
all rigging
brackets
and
straps should
be visually
inspected
for any damage,
evidence
of
wear. structural
defnrmation,
or cracks.
Particular
attention
should
be paid to excessive
wear at hoist hooking
points and load support
areas. Brackets
or straps showing
any kind of wear in these areas
must not be used and should be discarded.
ELECTRICAL
SHOCK
HAZARD
Failure to follow this warning
could result in personal
injury
or death.
Before
installing
or servicing
system,
always
turn off main
power
to system.
There may be more than one disconnect
switch. Turn off accessory
heater power
switch if applicable.
Tag disconnect
switch with a suitable warning
label.
This bracket
is to be used to rig/lift a Small Packaged
Product
onto
roofs or other elevated
structures.
PROPERTY
DAMAGE
HAZARD
Failure
to follow
this warning
could
result
in personal
injury/death
or property
damage.
Rigging
brackets
for one unit use only. When removing
a
unit at the end of its useful life, use a new set of brackets.
USE OF RIGGING
BRACKET
Field Installation
of Ri_in_
Bracket
1. If applicable,
remove
unit from shipping
carton. Leave top
shipping
skid on the unit for use as a spreader bar to prevent
the rigging
straps from damaging
the unit. If the skid is not
available,
use a spreader bar of sufficient
length to protect the
unit from damage.
2. Remove
4 screws in unit corner posts.
3. Attach each of the 4 nmtal rigging
brackets
under the panel
rain lip (See Fig. 7). Use the screws removed
in step 2 above
to secure the brackets
to the unit.
PROPERTY
DAMAGE
HAZARD
Failure
to follow
this warning
could
result
in personal
injury/death
or property
damage.
Rigging
bracket
MUST
be under
the
rain lip to provide
adequate
lifting.
PROPERTY
DAMAGE
HAZARD
Failure
to follow
this warning
could
result
in personal
injury/death
or property
damage.
Do not strip screws
when re-securing
the unit. If a screw is
stripped,
replace the stripped
one with a larger diameter
screw
(included).
Ri_in_/Liftin_
of Unit
1. Bend top of brackets
down approximately
30 degrees from
the corner posts.
2. Attach
straps
of equal
length
to the rigging
brackets
at
opposite
ends of the unit. Be sure straps are rated to hold the
weight of the unit (See Fig. 7).
3. Attach
a clevis of sufficient
strength
in the middle
of the
straps. Adjust the clevis location
to ensure unit is lifted level
with the ground.
4. After unit is securely
in place detach rigging
straps. Remove
corner
posts,
screws,
and rigging
brackets
then
reinstall
screws.
UNIT FALLING
HAZARD
Failure to follow this warning
could result in personal
injury
or death.
Never stand beneath
rigged units or lift over people.
INTRODUCTION
The
lifting/rigging
bracket
is engineered
and
designed
to be
installed
only on Small Packaged
Products.
UNIT
FALLING
HAZARD
Failure
to follow
this warning
could
result
in personal
injury/death
or property
damage.
When straps are taut, the clevis should
be a minimum
of 36
inches above the unit top cover.
After the unit is placed
on the roof curb or mounting
pad, remove
the top crating.

Advertisement

Table of Contents
loading

Table of Contents