Hide thumbs Also See for MC8900 QCP:
Table of Contents

Advertisement

NOTE:
1. Be sure that the power switch is turned off when replacing parts.
2. The language on the LCD is English only.
Preparation
1. Shift the bobbin winder spindle to the right.
2. Slid the drop feed lever to the right (away from you) to raise the feed dog.
3. Slide the speed adjusting lever to the left.
4. Remove the presser foot and raise the presser bar lifter (at normal up position).
5. Set the needle bar at the highest position.
Before starting the diagnosis test,
Check or replace the following part(s) if nothing happens when the power switch is turned on:
1. The connectors are connected properly (refer to page 7)
2. Replace the circuit board A (refer to page 7)
3. Replace the power supply cord.
4. Replace the switching power supply.
When replacing the sewing lamps or the printed circuit boards, do not turn on the machine.
1
2
3

DIAGNOSIS TEST

To start the diagnosis test:
1. While pressing the needle up/down and lock stitch
buttons, turn the power switch on.
The LCD screen display "Factory adjust", then
adjusting screen will appear.
2. Turn the jog dial to select "03.Self-Check".
3. Press the confirm button (Enter key).
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mc8200 qc

Table of Contents