General Information; Shipping And Packing List; Requirements; Installing The Unit - Lennox CBA27UHE-018 Installation Instructions Manual

Elite series air handler units
Hide thumbs Also See for CBA27UHE-018:
Table of Contents

Advertisement

CAUTION
As with any mechanical equipment, contact with sharp
sheet metal edges can result in personal injury. Take
care while handling this equipment and wear gloves and
protective clothing.

General Information

The Elite
CBA27UHE series air handler with all-alumi-
®
num coil is designed for installation with optional field-in-
stalled electric heat and a matching HFC-410A outdoor
unit.
This instruction is intended as a general guide and does
not supersede local or national codes in any way. Consult
authorities having jurisdiction before installation.

Shipping and Packing List

Package 1 of 1 contains:
1 – Assembled air handler unit
1 – Horizontal drip shield (CBA27UHE-060 only)
1 – Pipe nipple (Sch80, 3/4" I.D. x 5"
1 – Warranty card
NOTE – For downflow applications, order kit number
83M57.
Check the air handler for shipping damage; if found, im-
mediately contact the last carrier.

Requirements

IMPORTANT
This unit must be matched with an indoor coil as specified
in the Lennox Engineering Handbook. Coils previously
charged with HCFC-22 must be flushed.
In addition to conforming to manufacturer's installation in-
structions and local municipal building codes, installation
of Lennox air handler units (with or without optional elec-
tric heat), shall conform with the following National Fire
Protection Association (NFPA) standards:
• NFPA No. 90A - Standard for Installation of Air Condi-
tioning and Ventilation Systems
• NFPA No. 90B - Standard for Installation of Residence
Type Warm Air Heating and Air Conditioning Systems
This unit is approved for installation clearance to combus-
tible material as stated on the unit rating plate. Accessi-
bility and service clearances must take precedence over
combustible material clearances.

Installing the Unit

These units are factory-configured for upflow and hori-
zontal right-hand discharge installation. For downflow or
horizontal left-hand discharge, certain field modifications
are required.
DISASSEMBLE/REASSEMBLE AIR HANDLER UNITS
The air handler units consists of two factory-assembled
sections. It may be necessary to disassemble the sections
when positioning the unit for installation.
To disassemble:
1 - Remove access panels.
2 - Remove both blower and coil assemblies. This will
lighten the cabinet for lifting.
3 - Remove one screw from the left and right posts
inside the unit. Remove one screw from each
side on the back of the unit. Unit sections will now
separate.
To reassemble:
1 - Align cabinet sections together.
2 - Reinstall screws.
3 - Replace blower and coil assemblies.
4 - Replace access panel.
UPFLOW APPLICATION
Use the following procedures to configure the unit for up-
flow operations:
1 - Remove access panels.
2 - Remove and discard the horizontal drip shield (-060
model, used only on horizontal applications) and
the corrugated padding between the blower and coil
assembly.
3 - The horizontal drain pan must be removed when
the coil blower is installed in the upflow position.
Removing the horizontal drain pain will allow proper
air flow and increased efficiency.
4 - After removing the horizontal drain pan, place the
unit in the desired location. Set unit so that it is level.
Connect return and supply air plenums as required
using sheet metal screws as illustrated in figure 1.
5 - Install units that have no return air plenum on a
stand that is at least 14" from the floor to allow for
proper air return. Lennox offers an optional upflow
unit stand as listed in table 1.
UP-FLOW /
DOWN-FLOW
DRAIN PAN
FIGURE 1. Upflow Configuration
TABLE 1. Optional Side-Return Unit Stand
Model
All unit sizes
Page 4
HORIZONTAL DRAIN PAN
(MUST BE REMOVED)
(Upflow Only)
Kit Number
45K32

Advertisement

Table of Contents
loading

Table of Contents