Power Cord Installation; Complete Installation Checklist - Whirlpool 4GMVWC100 Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

POWER CORD INSTALLATION

Plug power supply cord into an grounded outlet. Turn power
supply on.
16.
Select plug
Select the plug that fits with the electric receptacle.
17.
Assemble plug
Assemble the plug into the end of the power cord.
18.
Secure power cord
Secure the power cord by seating the connection on the cord
lock. Place the cord lock cover, and push until it snaps. Make
sure the power cord connection is seated on the cord lock and
that the cord lock clamps correctly.
COMPLETE INSTALLATION
CHECKLIST
Check electrical requirements. Be sure you have correct
electrical supply and recommended grounding method.
Check that all parts are now installed. If there is an extra
part, go back through steps to see what was skipped.
Check that you have all of your tools.
Check that shipping materials were completely
removed from washer.
Check that water faucets are on.
Check for leaks around faucets and inlet hoses.
Remove film from console and any tape remaining on washer.
Check that washer is plugged into a grounded outlet.
Dispose of/recycle all packaging materials.
Read "Washer Care" in your Use and Care Guide.
To test and clean your washer, measure ½ of normal
recommended amount of powdered or liquid detergent
and pour it into washer basket or detergent dispenser
(on some models). Close lid. Select any cycle. Start washer
and allow to complete full cycle.
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents