Step 7 Optional: Cutting And Flaring The Pipes; Step 8 Connecting The Power And Communication Cables - Samsung AC100KXADEH Installation Manual

Hide thumbs Also See for AC100KXADEH:
Table of Contents

Advertisement

Installation Procedure
Step 7 Optional: Cutting and flaring
the pipes
1 Make sure that you have the required tools; pipe
cutter, reamer, flaring tool, and pipe holder.
2 If you want to shorten the pipes, cut it with a pipe
cutter, making sure that the cut edge remains at a
90° angle to the side of the pipe. See the illustrations
below for the correct edge cut.
90°
3 To prevent gas leakage, remove all burrs at the cut
edge of the pipe with a reamer.
4 Slide a flare nut onto the pipe.
5 Modify the flare with a flaring tool.
6 Check that the flaring has been properly made,
referring to the illustrations below.
Correct
Inclined
12
English
Oblique
Rough
Burr
Pipe
Reamer
Flaring tool
Damaged
Cracked
Uneven
Surface
Thickness
Step 8 Connecting the power and
communication cables
Electrical work must be done by the certified personnel.
∙ Wiring work should be performed in compliance with
related regulations following technical specifications
and installation guide.
∙ Be sure to install an exclusive power supply. If you
use a power strip for multiple electrical connections,
there is a risk of electric shock or fire.
∙ Be sure to install a circuit breaker with a rated current
sensitivity of over 30 mA.
∙ Fasten the screws on the terminal block to be within
the rated range and so that they do not loosen.
∙ Be sure to connect the ground wire. Install the power
wire and make sure it is shorter than 50 m. If the
length of the power wire exceeds 50 m, the product
may not work properly or the wire may be damaged.
Outdoor-to-indoor power and communication
cables specifications
Indoor power supply
Power supply
Max/Min (V)
1Φ, 220-240V,
±10%
50 Hz
Communication cable
0.75 to 1.5 mm², 2 wires
NOTE
∙ For outdoor use, the power supply cords of
the appliances must not be lighter than the
polychloroprene sheathed flexible cord. (Code
designation IEC: 60245 IEC 57 / CENELEC: H05RN-F
or IEC: 60245 IEC66 / CENELEC H07RN-F)
∙ When installing the indoor unit in a computer room
or net work room, use the double shielded (tape
aluminium / polyester braid + copper ) cable of
FROHH2R type.
Indoor power cable
2.5 mm² ↑ , 3 wires

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac100knpdehAc140kxadghAc140kxpdeh

Table of Contents