Alcatel-Lucent OAW-AP228 Installation Manual page 9

Table of Contents

Advertisement

Figure 7 Attaching the AP to the Mounting Bracket
Figure 8 Completed Installation
Grounding the AP
The grounding must be completed before powering up the AP. The grounding wire should be #8
AWG.
1. Peel the cover of one end of the grounding wire and place the bare grounding wire into the
included copper lug, and press firmly with the crimping pliers.
2. Fasten the copper lug to the grounding hole on the AP with the included M4 x6 screw.
Connecting the Ethernet Cable
To connect the Ethernet cable to the AP, perform the following steps using the cable glands that ships
with your AP.
Failure to use the included Ethernet cable glands can lead to connectivity and POE issues.
WARNING
| Installation Guide
OAW-AP228 Wireless Access Point
9

Advertisement

Table of Contents
loading

Table of Contents