Epson SQ-B50/2550 Technical Manual page 157

Table of Contents

Advertisement

REV.-A
3.3.4.4 Idle Lever Assembly Removal
[Step
1]
[Step 2]
[Step 3]
[Step 4]
Remove the side covers.
Remove the three E rings from drive transmission gear A, the platen transmission gear,
and drive transmission gear C, then remove the three gears.
Remove the planetary lever A assembly and planetary lever C assembly from the shaft
of drive transmission gear A.
Remove the sheet guide lever spring.
Planetary lever
C
Sheet guide
lever spring
~ 0
Drive transmission gear C
zY
f2
~~
E-ring
"
-
~
ICr'
_
Planetary lever A
~:
~.
0
<,~
,
"~~:::~:g",mi"iOO9"CA
N' ' @ J_-E.C' ' 9
~C,~
Platen transmission gear
[Step 5]
[Step 6]
[Step 7]
[Step 8]
Figure 3-12. Idle Lever Assembly Removal (1)
Remove the E ring from the paper loading sub roller shaft at the side frame L side, then
remove the paper loading sub roller shaft holder.
Remove the four CBS set screws (M3 x 6) from paper guide plate A, and remove paper
guide plate A with the paper loading sub roller shaft assembly (with the sheet guide lever
and paper loading sub gear still assembled).
Remove the left idle lever shaft holder lock pin from the stud on side frame L, then rotate
the shaft holder so that it becomes parallel to the cutout in the side frame.
Remove the idle lever assembly with the two idle lever shaft holders.
Paper guide
plate A
Idle lever assembly
CBS (M3 X 6)
\W
/1
i/l~.
/.1.
Paper loading
sub roller
E-ring
Left idle lever
shaft holder
_.7'"/"'-
-Stud
Side frame L
<
Bottom View
>
Figure 3-13. Idle Lever Assembly Removal (2)
3-13

Advertisement

Table of Contents
loading

Table of Contents