Transport And Lifting Instructions - Genie GTH-5519 Original Instructions Manual

Hide thumbs Also See for GTH-5519:
Table of Contents

Advertisement

Second Edition - First Printing
DANGER
Observe and Obey:
5 Genie provides this securement information
as a recommendation. Drivers are solely
responsible for making sure machines are
properly secured and the correct trailer is
WARNING
selected pursuant to US Department of
Transportation regulations, other localized
regulations, and their company policy.
5 Genie customers needing to containerize any
lift or Genie product should source a qualified
freight forwarder with expertise in preparing,
CAUTION
loading and securing construction and lifting
equipment for international shipment.
5 Only qualified operators should move the
machine on or off the truck.
NOTICE
5 The transport vehicle must be parked on a level
surface.
5 The transport vehicle must be secured to
prevent rolling while the machine is being
PROTECT THE
loaded.
ENVIRONMENT
Part No.
57.0009.0619

Transport and Lifting Instructions

5 Before loading for transport, make sure the
deck, ramps and machine tires are free of mud,
snow and ice. Failure to do so could cause the
machine to slide.
5 Be sure the vehicle capacity, loading surfaces
and chains or straps are sufficient to withstand
the machine weight. Genie telehandlers are
very heavy relative to their size. See the
serial label for the machine weight. See the
Inspections section for the serial label location.
GTH-5519
November 2015
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents