GE lp33 20 series Installation Manual page 28

Table of Contents

Advertisement

Access to the terminals and instructions for top feed cable connections
Q2 Q1
Fig. 4.8.1-2 Access to the input / output connections
NOTE !
For top feed applications, knock out appropriate holes in side channel cover for
cable conduits. See Fig 4.8.1-2
Modifications reserved
GE_UPS_ISG_LPS_3UL_20K_30K_2US_V010.docx
Critical Power
A
B
C
TOP FEED
AC ROUTING
 Use appropriate knockout in top cover shown
 Route cable through side channel as shown on
To access input, output and battery
connections proceed as follows:
 Open the front door "A" of the cabinet.
 Remove the protection panel "B".
 Remove the bottom fascia cover "C".
 Rout cable through side channel cable
entry.
29.66"
753.4m
6.04"
153.4m
above.
left.
Installation Guide LP33 Series 20 & 30 UL S2
7X KNOCKOUTS
FOR " CONDUIT
Page 28/43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lp33 30 series

Table of Contents