Unpacking; Installation; Desktop Or Shelf Installation - D-Link DGS-3224TGR User Manual

Managed 24-port gigabit ethernet switch
Table of Contents

Advertisement

This chapter provides unpacking and setup information for the switch.

Unpacking

Open the shipping carton of the switch and carefully unpack its contents. The carton should contain
the following items:
A DGS-3224TGR 24-Port Gigabit Layer 2 Ethernet switch
A mounting kit: 2 mounting brackets and screws
Four rubber feet with adhesive backing
One or two AC power cords
A printed QIG
A printed User's Guide
D-View 5.1 demo CD-ROM
This User's Guide with Registration Card on CD-ROM
If any item is found missing or damaged, please contact your local D-Link reseller for replacement.

Installation

Use the following guidelines when choosing a place to install the switch:
The surface must support at least 4 kg.
The power outlet should be within 1.82 meters (6 feet) of the device.
Visually inspect the power cord and see that it is secured to the AC power connector.
Make sure that there is proper heat dissipation from and adequate ventilation around the switch.
Do not place heavy objects on the switch.

Desktop or Shelf Installation

When installing the switch on a desktop or shelf, the rubber feet included with the device should first
be attached. Attach these cushioning feet on the bottom at each corner of the device. Allow adequate
space for ventilation between the device and the objects around it.
DGS-3224TGR Gigabit Ethernet Switch User's Guide
4
U
NPACKING AND
2
S
ETUP

Advertisement

Table of Contents
loading

Table of Contents