Samsung SGH-F300 Service Manual page 18

Gsm telephone
Hide thumbs Also See for SGH-F300:
Table of Contents

Advertisement

Main Electrical Parts List
12
Insert shieldcan in the lower part
of intenna
1)After assembling shieldcan at board following fig.1, Insert SPK and camera connectors following fig.2.
2)Attach poron sponge on SPK and camera connectors.
※ caution
1) Be care of scratch and molding damage.
13
sheet ⓛ
sheet ②
sheet ③
1) Attach sheet No.1,2,3,4,5 at the decided positions following fig.
2) Attach tape No.6 at the decided position following fig.
※ caution
1) Be care of scratch and molding damage.
SAMSUNG Proprietary-Contents may change without notice
This Document can not be used without Samsung's authorization
SPK sponge
tape ⑥
sheet ⑤
2-12
CAMERA
sponge
sheet ④

Advertisement

Table of Contents
loading

Table of Contents