HP 2920 Installation And Getting Started Manual page 31

Hide thumbs Also See for 2920:
Table of Contents

Advertisement

2.
Verify the switch boots correctly
power source and observe that the LEDs on the switch's front panel
indicate correct switch operation. When self test is complete, unplug the
switch.
3.
(Optional) Install one or more of the HP 2920 10G Expansion
Modules
(page
2-8).
4. (Optional) Install the HP 2920 Stacking Module
Depending on where the switch is mounted, it may be easier to install the
optional modules before mounting the switch.
5.
Mount the switch
telco rack, in an equipment cabinet, or on a horizontal surface.
6.
(Optional) Install the stacking cables
the HP 2920 Stacking Module, you can now install up to two stacking
cables and connect them to other switches in the desired stacking
topology.
7.
(Optional) Install or remove SFP transceivers
(page
2-17). Each HP 2920 Switch has either four slots for installing SFP
transceivers. If you have installed an HP 2920 10GbE 2-Port SFP+ Module,
you have an additional 2 slots for installing SFP+ transceivers. Depending
on where the switch is mounted, it may be easier to install the SFP
transceivers first. SFP transceivers can be installed or removed while the
switch is powered on.
8.
Connect the switch to a power source
mounted, plug it into the nearby main power source.
9.
Connect the network devices
network cables, connect the network devices to the switch ports.
10. (Optional) Connect a Management console
to modify the switch's configuration, for example, to configure an IP
address so it can be managed using a web browser, from an SNMP network
management station, or through a Telnet session. Configuration changes
can be made easily by using the included console cable to connect a PC
to the switch's console port.
At this point, the switch is fully installed. See the rest of this chapter if you
need more detailed information on any of these installation steps.
(page
(page
2-12). The Switch can be mounted in a 19-inch
(page
(page
2-19). Using the appropriate
Installing the Switch
Installation Procedures
2-6). Plug the switch into a
(page
2-10).
2-16). If you have installed
(page
2-18). Once the switch is
(page
2-20). You may wish
2-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents