3.TROUBLE SHOOTING GUIDE ...7-8 4.TESTING PROCEDURE ...9-10 5.EXPLODED VIEW & PACKING VIEW (SR-GA421/SR-GA281) ...11-12 6.REPLACEMENT OF PARTS LIST & PACKING LIST (SR-GA421/SR-GA281) ...13-14 7.EXPLODED VIEW & PACKING VIEW (SR-GA721) ...15-16 8.REPLACEMENT OF PARTS LIST & PACKING LIST (SR-GA721) ...17-18 This service information is designed for experienced repair technicians only and is not designed for use by the general public.
This puts the micro-switch in the warming position. 2) When the pan is not in place within the rice cooker, the center thermostat is not depressed. a. In this condition, the outer spring is not compressed within the center thermostat preventing the metal from reaching its normal operating position.
Page 6
SR-GA421/SR-GA281/SR-GA721 2. FUNCTION OF CENTER THERMOSTAT AND THERMALFUSE C. Thermal Fuse The thermal fuse is used to open the circuit to the cooking heater when the temperature has gone unusually high. This happens in cases such as incomplete contact between the heater and pan or if the switch buttons is forced to stay on keeping the heater energized abnormally.
Switch lever properly adjust? No continuity of sheathed heater? Forced application of current? Center thermostat defective? (Check with evaporation test) Usage correct? SR-GA421/SR-GA281/SR-GA721 Remedy ● Replace AC cord. ● Locate cause for fusing and replace fuse. ● Replace Frame ass’y.
SR-GA421/SR-GA281/SR-GA721 3. TROUBLESHOOTING GUIDE Symptom ● Earlier Switching-off ● Poor cooking finish Too hard Too soft Half-boiled Keep warm function ● Warming fails (Warm lamp not shown) ● Warming fails (Warm lamp shown) Diagnosis Poor contact between pan and sheathed...
5 cm. Center thermostat Holes of tissue paper COOK WARM SR-GA421/SR-GA281/SR-GA721 Water Level Figure 3 Pan (viewed from above) Pan flange section Tissue paper...
Page 10
SR-GA421/SR-GA281/SR-GA721 4. TESTING PROCEDURE 3. Boiling control lever adjustment Such a mechanical operation as center thermostat goes up and down is used to turn on and off the micro-switch. Check and adjust this relationship as shown below. When the boiling switch is turned on.
6. REPLACEMENT OF PARTS LIST & PACKING LIST (SR-GA421/SR-GA281) PARTS LIST Ref. Part Name LID ASS’Y LID HANDLE MEASURING CUP ALUMINIUM PAN THERMOSTAT ASS’Y CAST HEATER ASS’Y HANDLE FOR BOBY BODY COMPLETE NAME PLATE SWITCH ASS’Y SWITCH PANEL DECORATIVE PANEL LAMP BOARD ASS’Y...
SR-GA421/SR-GA281/SR-GA721 6. REPLACEMENT OF PARTS LIST & PACKING LIST (SR-GA421/SR-GA281) PARTS LIST Ref. Part Name CORD BUSHING SCOOP CAUTION LABEL (BODY) LIST OF SCREW Ref. Part Name TAPPING SCREW SEMS SCREW TAPPING SCREW TAPPING SCREW SEMS SCREW TAPPING SCREW TAPPING SCREW PACKING LIST Ref.
SR-GA421/SR-GA281/SR-GA721 8. REPLACEMENT OF PARTS LIST & PACKING LIST (SR-GA721) LIST OF SCREW Ref. Part Name TAPPING SCREW P.F. HOLD SCREW SEMS SCREW TAPPING SCREW TAPPING SCREW SEMS SCREW TAPPING SCREW TAPPING SCREW TAPPING SCREW TAPPING SCREW PACKING LIST Ref.