Check Your Package Contents; Installation - D-Link DGS-1024D Quick Installation Manual

16 / 24-port gigabit desktop switch
Hide thumbs Also See for DGS-1024D:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Quick Installation Guide
DGS-1016D / DGS-1024D

Check Your Package Contents

These are the items included with your DGS-1016D / DGS-1024D purchase:
DGS-1016D /
DGS-1024D
Notice Before Setup the DGS-1016D / DGS-1024D
The setup of the Switch can be performed using the following steps:
A.
Install the DGS-1016D / DGS-1024D in a fairly cool and dry place. See Technical
Specifications for the acceptable operation temperature and humidity ranges.
B.
Install the Switch in a site free from strong electromagnetic source, vibration, dust, and
direct sunlight.
C.
Leave at least 10cm of space at the left and right hand side of the Switch for ventilation.
D.
Visually inspect the power cable and ensure that it is firmly inserted into a suitable power
outlet.

Installation

Desktop or Shelf Installation
When installing the Switch on a desktop
or shelf, the rubber feet included with
the device must be first attached. Attach
these cushioning feet on the bottom at
each corner of the device. Allow enough
ventilation space between the device
and the objects around it.
16 / 24-Port Gigabit Desktop Switch
Quick Installation
Guide
The Switch can be mounted in an EIA standard size,
19-inch rack, which can be placed in a wiring closet
with other equipment. To install, attach the mounting
brackets on the switch's front panel (one on each side)
and secure them with the screws provided.
Then, use the screws provided with the equipment
rack to mount the Switch in the rack.
Power Cord
Rack Installation
2
Rack-mount bracket

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-1016d

Table of Contents