Bryant 189BNV EVOLUTION Service Manual page 27

V variable speed air conditioner/v variable speed heat pump
Hide thumbs Also See for 189BNV EVOLUTION:
Table of Contents

Advertisement

9. With using a slot screwdriver, lift up the on the side tab to
pry the cover off from the RTV. Be sure not to break the tab.
10. It may be necessary to leverage the screwdriver against
cover next to tab so as not to break the tab while loosening.
11. Once Cover is loosened on one side, use screwdriver along
freed edge to remove.
12. Remove cover, unplug old harness, plug in new harness,
verify bushing is reinstalled and plug leads leave the
terminal box through the bushing; reinstall cover pushing
one side down then the other.
NOTE: DO NOT SCRAP SEALANT
13. Reinstall compressor sound blanket making sure discharge
thermistor and compressor power harness are routed as they
were from the factory.
14. Route compressor power harness to new double loop wire
tie and then to the wire retainers in tube sheet (route as they
were originally to make sure they will not contact fan blade)
and then route into control box and reinstall two control
box screws. (See image below)
15. Reinstall service panel.
16. Route compressor harness choke to left hand side of the top
of control box and push in wire tie. Pull wires tight as they
enter control box and tighten second wire tie.
17. Reconnect compressor power harness to the inverter.
NOTE:
Reference enclosed wiring diagrams and unit
wiring diagrams in Owner's Manual to aid in reattaching
electrical connections.
18. Reinstall control box cover.
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

288bnv evolution

Table of Contents