PCB DIP switch setting (DIP SW 2, set of 8)
Is switch #1 set correctly for Return Water Control (ON) or Supply Water Control (OFF)?
If continuous boiler operation is required, is switch #7 in the up (ON) position?
If high temperature venting has been installed (CPVC or polypropylene), is switch #8 in the up (ON) position?
Front Panel DIP switch setting (DIP SW 1, set of 10)
Is switch #2 set correctly for Celsius (ON) or Fahrenheit (OFF)?
Is switch #4 and #5 are set correctly for the installation altitude?
Front Panel DIP switch setting (DIP SW 2, set of 2)
Is switch #2 set correctly for natural gas (OFF) or propane gas (ON)?
Operating the boiler
Have you given the Installation & Operation Manual and User's Information Manual to the owner for future reference?
Have you shown the owner how to shut off the gas in case of an emergency?