Displaying The Status Codes; Using Check Programmes; Start-Up; Carrying Out The Initial Start-Up - Vaillant home combi Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

7 Start-up

5.
Proceed accordingly for all parameters that need to be
changed.
6.
Press and hold the
configuring the diagnostics codes.
The display switches to the basic display.
6.2

Displaying the status codes

The status codes display the product's current operating
status.
Status codes – Overview (→ Page 34)
6.2.1
Activating the status codes display
1.
Hold the
button down for more than 7 seconds.
S.XX is shown on the display, followed by the heat-
ing flow temperature, the internal system pressure
and the cylinder temperature (depending on the ver-
sion).
2.
Press the
button to exit this menu.
The display switches to the basic display.
6.3

Using check programmes

By activating various check programmes, you can trigger
various special functions on the product.
Check programmes – Overview (→ Page 30)
6.3.1
Calling up the check programmes
1.
Hold the
button down for more than 5 seconds.
All symbols are shown in the display.
is shown in the display.
2.
Press and hold the
is shown in the display.
3.
Press the
or
button to select the check
programme.
4.
Press the
button to confirm.
on is shown in the display and the programme
starts.
5.
Press the
and
buttons at the same time whilst
running a check programme.
The heating water temperature and the filling pres-
sure for the heating installation are shown altern-
ately in the display.
6.
Press the
button to return to the check programme.
The display shows the check programme.
7.
Press the
button to finish the check programme.
OFF is shown in the display.
8.
Press and hold the
the check programmes.
End is shown in the display.
The display switches to the basic display.
16
button for 3 seconds to finish
button for five seconds.
button for 3 seconds to finish
Note
If you do not press any button for 15 minutes,
the current programme is automatically can-
celled and the basic display is shown.
6.3.2
Displaying the pressure and temperature of
the heating during a check programme
1.
Press the
buttons simultaneously.
Display the filling pressure in the heating installation.
Display the heating flow temperature.
2.
Press the
button to display the check programme
currently running.
7
Start-up
7.1

Carrying out the initial start-up

Initial start-up must be carried out by a customer service
technician or an authorised competent person using the first-
commissioning-checklist. The first-commissioning-checklist
in the appendix (→ Page 43) of the installation instructions
must be filled in and stored carefully along with the unit's
documentation.
Carry out the initial start-up using the first-commission-
ing-checklist in the appendix.
Fill out and sign the first-commissioning-checklist.
7.2

Checking the factory setting

Caution.
Risk of material damage caused by mak-
ing unauthorised settings.
Never modify the factory setting of the gas
pressure regulator of the gas valve.
The product combustion is checked on-site and pre-set to
the type of gas specified on the identification plate.
Check the information about the type of gas indicated on
the identification plate and compare this with the type of
gas available at the installation location.
Conditions: The product model is not compatible with the local gas type.
Do not start up the product.
Conditions: The product model is compatible with the local gas type.
Proceed as described below.
Installation and maintenance instructions HOME 0020224355_00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents