Verify The Switch Passes Self Test - HP 1405-5 Installation And Getting Started Manual

1405 switch series
Table of Contents

Advertisement

N o t e

2. Verify the Switch Passes Self Test

Before mounting the switch in its network location, you should first verify it
is working properly by plugging it into a power source and verifying it passes
its self test.
1.
Connect the AC/DC adapter's power cord to the power connector on the
back of the switch, and then plug the AC/DC power adapter into a nearby
properly grounded electrical outlet.
The switches are shipped with one of two types of AC/DC power adapter;
either the universal AC/DC adapter with an AC power cord, or the wall plug-
in AC/DC adapter (without an AC power cord).
Connect the wall plug-in
AC/DC power adapter to
the switch and an AC
power outlet
Connect the universal
AC/DC power adapter to
the switch and an AC
power outlet
Figure 2-1. Connecting the switch power adapter
Installing the Switch
Installation Procedures
2-6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1405-81405-5g1405-8g

Table of Contents