Step 2.8 Installing and connecting the assembly pipes to the refrigerant pipes (assembly pipe)
Step 3.2 Connecting the power and communication cables and the refrigerant pipes
Step 4.3 Performing final check and trial operation
DB68-06039A-00.indd 3
31
31
33
37
45
48
3
English
5/25/2016 7:08:29 PM