Room Thermostat Connection; Outdoor Sensor Connection - Ariston CLAS HE SYSTEM 24 Installation And Servicing Instructions

Hide thumbs Also See for CLAS HE SYSTEM 24:
Table of Contents

Advertisement

installation

Room thermostat connection

Introduce the thermostat wire
-
- Loosen the cable clamp using a screwdriver and insert the
wires leading from the room thermostat one at a time.
- Connect the wires to the terminals as indicated in the figure
below, removing the link
- Make sure that they are well connected and that they are
not subject to stress when the control panel lid is opened or
closed
- Close the flap again, then replace the control panel cover and
the front casing.
Connector TA on PCB
(low voltage switching)

Outdoor sensor connection

Introduce the outdoor sensor wires
-
- Loosen the cable clamp using a screwdriver and insert the
wires leading from the outdoor sensor one at a time.
- Connect the wires to the terminals as indicated in the figure
below;
- Make sure that they are well connected and that they are
not subject to stress when the control panel lid is opened or
closed;
- Close the flap again, then replace the control panel cover and
the front casing.
- Refer to page 39 for setting the parameters when using the
outdoor sensor.
Outdoor Sensor
Connector SE on PCB
N
:
w
ote
heN
coNNectiNg
the
240V
Not
ruN
cables
(
which
are
low
Voltage
preVeNt
iNduced
Voltage
4
,
boiler
to
exterNal
coNtrols
do
aNd
cables
for
switchiNg
circuits
)
,
together
use
seperate
cables
oN
the
low
Voltage
circuits
TA1
The boiler can be connected to a central heating system that
uses two zone valves to allow connection to an indirect storage
cylinder.
There are two wiring diagrams shown, one for the connection to
an Unvented Cylinder and one for connection to an open vented
cylinder.
In both cases the boiler connection is shown as TA1.
When connecting the boiler to an external cylinder do not run
40V cables and the cables for the room terminal together, use
separate cables to prevent induced voltage on the low voltage
switching circuit.
N
:
t
ote
he
he system
boiler
uNless
suitable
Important!!
Ensure that a balancing valve is fitted on the
cylinder return and balanced correctly at
commissioning stage.
to
.
SE
CARTE CHAUDIERE
AMPC-GAL1
'y' p
use
of
a
laN
system
is
Not
due
to
the
low
Voltage
switchiNg
.
relay
coNtrols
are
used
clas
possible
with
the
of
the
appliaNce

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents