Pre-Start Up Preparations - North Star 27500 Owner's Manual

North star power take-off generator owner's manual
Table of Contents

Advertisement

Dev ice
Air Conditioner (12,000 Btu)
Battery Charger (20 Amp)
Belt Sander (3")
Chain Saw
Circular Saw (6-1/2")
Coffee Maker
Compressor (1 HP)
Compressor (3/4 HP)
Compressor (1/2 HP)
Curling Iron
Dishwasher
Edge Trimmer
Electric Nail Gun
Electric Range (one element)
Electric Skillet
Freezer
Furnace Fan (1/3 HP)
Hair Dryer
Hand Drill (1")
Hand Drill (1/2")
Hand Drill (3/8")
Hand Drill (1/4")
Hedge Trimmer
Home Computer
Impact Wrench
Jet Pump
Lawn Mower
Light Bulb
Microwave Oven
Milk Cooler
Oil Burner on Furnace
Oil Fired Space Htr (140,000 Btu)
Oil Fired Space Htr (85,000 Btu)
Oil Fired Space Htr (30,000 Btu)
Oven
Paint Sprayer, Airless (1/3 HP)
Paint Sprayer, Airless (handheld)
Radio
Refrigerator
Slow Cooker
Submersible Pump (1-1/2 HP)
Submersible Pump (1 HP)
Submersible Pump (1/2 HP)
Sump Pump
Table Saw (10")
Television
Toaster
Vacuum cleaner
VCR
Water Heater
Weed Trimmer
(a) Hard-starting motors require 3 to 5 times the
rated running watts.
(b) These loads may require up to 15 minutes to
restart due to its normal build up of compressor head
pressure.
NOTE: For extremely hard to start loads such as
air conditioners and air compressors, consult the
equipment dealer to determine the maximum wattage.
Running Watts
1700 (a)
500
1000
1200
900
1000
2000 (a)
1800 (a)
1400 (a)
700
1200
500
1200
1500
1250
800 (b)
1200 (a)
1200
1100
875
500
250
450
150
500
800 (a)
1200
100
700
1100 (a)
300
400
225
150
4500
600 (a)
150
200
600 (b)
200
2800 (a)
2000 (a)
1500 (a)
600 (a)
2000 (a)
500
1000
250
70
3000
500
7

PRE-START UP PREPARATIONS

Your generator has been thoroughly tested prior to
shipment from the factory.
occur during shipping, so be sure to check for
damaged parts, loose or missing nuts and bolts. If the
these problems occur, call Customer Service at 1-800-
270-0810.
GROUNDING - All units must be grounded. Drive
a 3/4" or 1" copper pipe or rod into the ground close to
the generator.
The pipe/rod must penetrate moist
earth. Connect an approved ground clamp to the pipe.
Run a 8 gauge wire from the clamp to the generator
ground screw. Do not connect to a water pipe or a
ground used by a radio system.
OPERATING SPEED
The generator must be run at the correct speed in
order to produce the proper electrical voltage and
frequency.
The output voltage should be checked to ensure
the generator is working properly subsequent to
connecting a load to the generator. Failure to do so
could result in damage to equipment plugged into the
unit and possible injury to the individual.
All engines have a tendency to slow down when a
load is applied. When the electrical load is connected
to the generator, the engine is more heavily loaded,
and as a result the speed drops slightly. This slight
decrease in speed, together with the voltage drop
within the generator itself, results in a slightly lower
voltage when the generator is loaded to its full capacity
than when it is running with no load.
variation has no appreciable effect in the operation of
motors, lights and most
equipment and clocks will be effected if correct RPM is
not maintained. See Load vs. Output chart
Load
Percent of
Speed
Generator
(RPM)
Output
0 %
3780
50 %
3600
100 %
3480
Output voltage should be checked periodically to
ensure continued proper operation of the generating
plant and appliances, it can be checked with a portable
meter. Frequency can be checked by using an electric
clock with a sweep second hand. Timed against a
wrist watch or a stop watch the clock should be correct
within +/- 2 seconds per minute.
adjustments should be done by a qualified technician.
However, damage can
The slight
appliances.
Electronic
Output
Frequency
Generator
(Hz)
voltage at 120V
Receptacle
63.0
125V
60.0
122V
58.0
118V
All speed setting