GE JP328BK-BB Owner's Manual & Installation Instructions page 14

Table of Contents

Advertisement

Available languages

Available languages

FINAL INSTALLATION AND OPERATION CHECKLIST –
Do these in the following order:
Remove all packaging material (protective film, labels, tape, cardboard).
1
Raise the cooktop and remove any packaging material, and confirm wiring is not pinched nor in
2
contact with moving parts.
Confirm the cooktop is grounded.
3
Remove all items from the top of the cooktop surface.
4
Confirm the circuit breaker is closed (RESET) or the circuit fuses are replaced.
5
Confirm power is in service to the building.
6
Turn on each of the surface units (one at a time) to confirm that heating results – do not touch the
7
surface unit – then turn off the surface unit. If heating is not detected, recheck the cooktop wiring
connections. If change is required, retest again. If no change is required, have the building wiring
checked for proper connections and voltage.
Be sure all cooktop controls are in the OFF position before leaving the cooktop.
8
14
Installation Instructions
49-80759

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jp328skss

Table of Contents