Installation; Installation Method - Daikin FLKS25BAVMB Technical Data Manual

Hide thumbs Also See for FLKS25BAVMB:
Table of Contents

Advertisement

9

Installation

9 - 1 Installation method

Photocatalytic deodorising filter
B
j
Air purification filter
j
C
Photocatalytic deodorising filter
j
B
Air purification filter
j
C
Space for installation
work. Min. (200mm)
Hold the recessed parts of the
frame and unhook the four
claws.
Infrared remote control
j
D
(M3 x 20L)
• Indoor Units • R410A • FLKS-BAVMB
There should be no space between
ceiling and the unit.
Space for installation work.
Min. (200mm)
Air filters
A
j
M4 x 25L
50 mm or more from floor
Before screwing the remote control holder to
the wall, make sure that control signals are
properly received by indoor unit.
Remote
j
E
control holder
• Split Sky Air • Indoor Units
50 mm or more from walls (on
Mounting plate
both side)
Cut thermal insulation pipe to an appropriate length
and wrap it with tape, making sure that no gap is left in
the insulation pipe's cut line.
Caulk pipe hole
gap with putty.
Space for
installation work.
Min. (200mm)
Space for installation work. Min.
(200mm)
The mounting plate
should be installed on a
wall which can support
the weight of the indoor
unit.
Wrap the installation pipe
with the finishing tape
from bottom to top
9
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flks35bavmbFlks50bavmbFlks60bavmb

Table of Contents