Layout & Components Camray External - Worcester GREENSTAR CAMRAY EXTERNAL Instruction Manual

Floor standing external oil fired condensing boiler using balanced flue system
Table of Contents

Advertisement

2
1
35
34
33
32
31
30
29
28
26
27
25
24
23
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL &
EXTERNAL SYSTEM 12/18-18/25-25/32
8 716 115 667a (05.2009)
4
3
20
22
21
LAYOUT & COMPONENTS
CAMRAY EXTERNAL
The diagram opposite excludes the top, front
and RH side casing panels.
1
2
3
4
5
6
7
8
9
10 CONDENSATE OUTLET
5
6
11 FLOW/OPTIONAL OPEN VENT
7
12 BAFFLE RETAINER ACCESS DOOR
13 CONTROL & MANUAL RESET
14 AUTO-RESET HIGH LIMIT
15 PRIMARY HEAT EXCHANGER
16 CONDENSATE TRAP & BRACKET (supplied)
8
17 COMBUSTION CHAMBER ACCESS
18 DRAIN/OPTIONAL FEED &
9
19 BASE PLATE AND OIL DRIP TRAY
20 DEFLECTOR PLATE
10
21 OIL SUPPLY ISOLATING VALVE
11
22 BURNER AIR INTAKE (CONNECTED
12
13 & 14 (location)
23 BURNER MOTOR
24 OIL PUMP (BEHIND PLASTIC COVER)
15
25 LOCKOUT RESET BUTTON (ON FRONT
16
26 BURNER CONTROL BOX
17
27 RIELLO RDB BURNER
28 RIELLO RDB BURNER COVER
29 FLUE MANIFOLD ACCESS COVER
30 DATA LABEL
18
31 FLUE GAS SAMPLING POINT
32 MODE SWITCH
33 BOILER OVERHEAT RESET BUTTON
19
34 FLUE OVERHEAT RESET BUTTON
35 TEMPERATURE CONTROL KNOB
CONTROL BOX ASSEMBLY
CASING SIDE PANEL
FLUE OVERHEAT THERMOSTAT PHIAL
AIR INLET CASING
FLEXIBLE AIR DUCT (CONNECTING TO
AIR INTAKE ON BURNER)
CASING SUPPORT PANEL
SECONDARY HEAT EXCHANGER
BLEED POINT (ONE ON EITHER SIDE)
SECONDARY HEAT EXCHANGER
SECONDARY HEAT EXCHANGER
DRAIN
CONNECTION
OVERHEAT THERMOSTAT PHIAL &
THERMOSTAT PHIAL (LOCATION)
DOOR
EXPANSION CONNECTION
BY FLEXIBLE DUCT (5) TO AIR
INLET CASING (4) )
OF BURNER CONTROL BOX)
LAYOUT & COMPONENTS
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents