Performing the Gas Leak Tests

You must check if there is a gas leak before completing all the
installation process. (connecting the assembly pipe and hose between
indoor unit and outdoor unit, insulating the cables, hose and pipe,
and fixing the indoor unit to the installation plate)
To check for gas leaks on the...
Indoor unit
Outdoor unit

Fixing the Indoor Unit in Place

After checking for a gas leak in the system, you can insulate the pipe,
hose and cables. Then place the indoor unit on the installation plate.
1
To avoid condensation problems, place heat-resistant polyethylene foam
separately around each refrigerant pipe in the lower part of the indoor unit.
2
Wrap the refrigerant pipe and the drain hose in the rear of the indoor
unit with the absorbent pad.
➢ Wind the pipe and hose three times to the end of the indoor unit
with the absorbent pad. (20-mm interval)
3
Wind the pipe, assembly cable and drain hose with insulation tape.
4
Place the bundle (the pipe, assembly cable and drain hose) in the
lower part of the indoor unit carefully so as not to be projected from
the rear of the indoor unit.
5
Hook the indoor unit on the installation plate and move the unit to the
right and left until it secures in place.
6
Wrap the rest of the pipe with vinyl tape.
7
Attach the pipe to the wall using clamps (Optional).
Using a leak detector, check the...
Flare nuts at the end of sections
C and D.
Valves on sections A and B.
C
OMPLETING THE
C
D
❊ The designs and shape are subject to change
according to the model.
Installation plate
I
NSTALLATION
A
B
13
E-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents