Controls Panel; Lcd General Features - Biasi Inovia 25C ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for Inovia 25C ERP:
Table of Contents

Advertisement

1.3

Controls panel

11
12
13
14 15
Fig. 1.3
11 D.h.w. temperature increase key
12 D.h.w. temperature reduce key
13 3 star preheating function key
14 Reset/Stand-by/Winter/Summer key
15 Reset Key
16 Access to function menu key
17 C.h. temperature reduce key
18 C.h. temperature increase key
19 Clock key: used to access the clock
functions (Time/Day/Date setting) and
the timer (3 star preheating function and
heating flow timer)
20 LCD display
APPLIANCE DESCRIPTION
20
19
18
17
16
RESET that takes all parameters
back to the factory value occurs
only
by
08=04". Reset is displayed by
switch on of all symbols present
on the display.
Press keys 15 and 19 (Fig. 1.3)
simultaneously for 5 seconds in
order to reset all the scheduling
(both preheating and heating).
After resetting or in default sta-
tus, the heating function will be
activated for every day, for all 24
hours.
This is also the default status of
boilers upon delivery.
Resetting will be confirmed by
a flashing RESET along with the
symbol
1.4

LCD general features

For the boiler technical informations refer to
the section "TECHNICAL INFORMATION"
to page 28.
Fig. 1.4
setting
"parameter
.
- 9 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inovia 30c erpInovia 35c erp

Table of Contents