Download Print this page

Baxi Boston 2 80 RS User Operating Instructions page 4

Floor standing room sealed gas fired central heating boilers
Hide thumbs Also See for Boston 2 80 RS:

Advertisement

Page 4
CLEANING THE CASE
The painted panels should be wiped
with a damp cloth and then dried
completely. DO NOT USE ABRASIVE
CLEANING AGENTS.
SPARE PARTS
Any repairs to the appliance will usually
be the responsibility of the Installer
during the guarantee period after which
spare parts may be obtained through
approved Baxi stockists if required.
Quote the appliance name, model
number and where possible the part
number when ordering spares. (A parts
list is included in the Installation and
Servicing Instuctions.)
Click here for Helplines
GUARANTEE
Your BAXI BOSTON 2 is designed and
produced to meet all the relevant British
Standards.
Baxi Limited provide a 12 month
guarantee on the Boiler - other parts of
the system are covered by the Installer
or other manufacturers. The guarantee
operates from the date installation is
completed for the customer who is the
original user.
To maximise the benefit from our
guarantee we urge you to return the
reply-paid guarantee registration.
This does not in any way prejudice your
rights at Common Law. Such rights
between the customer and the installer
or supplier from whom the unit was
purchased remain intact.
Any component or part which
becomes defective during the
guarantee period as a result of faulty
workmanship or material whilst in
normal use will be repaired or
replaced free of charge.

Advertisement

loading